1.1.3

Lamp Power Supply

The lamp power supply (LPS) is located at the rear of the projector. The LPS supplies the lamp with power.
faulty supply must be replaced. Failure to comply results in death or serious injury.
1.1.4

Power

Power supplies are not serviceable. Any faulty power supply module must be replaced. Never open or attempt
to service a power supply. Contact Technical Support for a replacement.
projector off and disconnect it from AC power prior to disassembly. Failure to comply results
in death or serious injury.
specified on the license label on the back of the projector. Always turn the projector off
before you unplug the AC power cord. Wait 15 minutes for the main exhaust fan to turn OFF
and for the lamp to cool before you unplug the projector. Failure to comply could result in
death or serious injury.
connected to power. The dedicated earth wire can only be installed by a Christie accredited
service technician or an electrician. All installations must meet the electrical codes for your
area. The protected earth wire must be green/yellow 12 AWG minimum. Failure to comply
could result in death or serious injury.
Power remains available to the projector even after lamp shutdown (STANDBY mode) so that online
monitoring and software upgrades can be performed. The projector is powered by 200–240VAC power from
the theater. The switching LPS (Lamp Power Supply) provides a well-regulated DC current up to 97 amps with
a maximum LPS power of 2.3kW. The power output from the LPS is controlled by the PIB through a dedicated
'RS232' connection from the backplane to the LPS. A secondary 100–240VAC inlet can be selected using a
switch, which allows the main electronics to be powered separately through a universal 100–240VAC UPS.
The main LPS is powered through the main 200–240VAC inlet. A discrete AC switch above the 2 inlets lets
you select how the main electronics are powered.
• From the main inlet:
• From the secondary inlet supplied by the UPS:
1-2
The LPS is cannot be serviced. Never attempt to open or service the LPS. A
High voltages may be exposed—Qualified personnel only. Always turn the
Do not operate the projector if the AC supply is not within the voltage range
A dedicated earth wire must be installed on the projector before it can be
, which requires only one power cord to supply the entire unit.
A only
using an additional power cord (not provided).
A+B
+