Preparing for Installation
These topics describe how to prepare to install the server.
"Shipping Kit Inventory" on page 25
■
"Handling Precautions" on page 26
■
"ESD Precautions" on page 27
■
"Tools Needed for Installation" on page 27
■
Related Information
"Understanding the Server" on page 9
■
"Confirming Specifications" on page 17
■
"Installing the Server" on page 29
■
"Connecting Cables" on page 61
■
"Powering On the Server the First Time" on page 73
■
Shipping Kit Inventory
Standard system components are installed at the factory. Options such as a PCIe cards or a
monitor are shipped separately.
Note -
appears damaged, request that the carrier's agent be present when the carton is opened. Keep all
contents and packing material for the agent's inspection.
Verify that you have received all the parts of your server:
Server
■
Rackmount kit
■
Package of mounting screws and nuts in assorted sizes to fit various types of racks and
■
cabinets
Earth grounding lug and two M5 nuts
■
Inspect the shipping cartons for evidence of physical damage. If a shipping carton
Preparing for Installation
25