Preparing For Installation; Shipping Kit - Oracle SPARC T8-4 Installation Manual

Hide thumbs Also See for SPARC T8-4:
Table of Contents

Advertisement

Preparing for Installation

These topics detail the precautions to follow, the tools to assemble, and the tasks to perform
prior to installing the server.
Step
Description
1.
Confirm that you have received all the items you ordered
for the type of rackmount kit you will be using in your
installation.
2.
Review ESD and safety precautions.
3.
Verify that you have the correct tools.
4.
Prepare the server for installation.
Related Information
"Installing the Server" on page 29
"Connecting Cables" on page 51
"Powering On the Server for the First Time" on page 65

Shipping Kit

Verify that you have received all of the components that ship with your server.
Note -
it in its shipping crate at its final destination for 24 hours. This resting period prevents thermal
shock and condensation.
When you receive the server, place it in the environment where you will install it. Leave
Links
"Shipping Kit" on page 23
"Handling Precautions" on page 25
"ESD Precautions" on page 25
"Tools Needed for Installation" on page 26
"Prepare the Server" on page 27
Preparing for Installation
23

Advertisement

Table of Contents
loading

Table of Contents