Suzuki VL800 Service Manual page 96

Hide thumbs Also See for VL800:
Table of Contents

Advertisement

• Install the new O-ring.
• Install the water pump cover.
NOTE:
Fit the clamp to the bolt A .
CAM CHAIN/CAM CHAIN TENSIONER
• Install the cam chain tensioner and cam chain.
# Cam chain tensioner bolt: 10 N . m (1.0 kgf . m, 7.0 lb-ft)
1 For front cylinder
2 For rear cylinder
NOTE:
The No. 2 cam chain (For front cylinder) is a little longer than the
No. 1 cam chain.
GENERATOR
• Degrease the tapered portion of the generator rotor assembly
and also the crankshaft Use nonflammable cleaning solvent to
wipe off the oily or greasy matter to make these surfaces com-
pletely dry.
• Install the key.
• Install the starter driven gear to the rotor.
• Install the generator rotor assembly and tighten its bolt to the
specified torque.
# Generator rotor bolt: 160 N . m (16.0 kgf . m, 115.5 lb-ft)
ENGINE 3-57

Advertisement

Table of Contents
loading

This manual is also suitable for:

Intruder vl800

Table of Contents