6-14 COOLING SYSTEM
• Apply grease to the O-ring.
• Set the water pump shaft end A to the oil pump shaft B.
( 99000-25030: SUZUKI SUPER GREASE "A" (For USA)
99000-25010: SUZUKI SUPER GREASE "A"
(For the others)
• Install the water pump screws.
• Apply engine coolant to the O-ring and install the water pump
cover.
• Tighten the water pump cover bolts.
NOTE:
Fit the clamp to the bolt C .
• Connect the water hose.
• Install the reserve tank.
• Install the secondary gear case cover.
• Pour engine coolant. (#2-13)