Maintenance Schedule - Muratec F-360 Field Engineering Manual

Facsimile system
Hide thumbs Also See for F-360:
Table of Contents

Advertisement

5.1 Maintenance schedule

Scanner Section
Parts Name
Pick up roller
Separator roller
Retard roller
Feed roller A
Feed roller B
Exit roller
Contact glass
Exposure Lamp
✽ : Replace when not working
Paper Take-up / Transport Section
Parts Name
Paper pick-up roller
Feed roller AP
Feed roller BP
Exit roller P
Image Transfer Section
Parts Name
Image transfer roller
Developing Section
Parts Name
Drum cartridge
Toner cartridge
Fixing Section
Parts Name
Fixing unit
Note: " " means to clean the mechanism when a paper take-up or transport failure occurs.
Maintenance Cycle (pages)
Clean
Replace
100,000
100,000
80,000
100,000
100,000
100,000
Clean if it
dirty
1,000 hours
(continuos
lighting)
Maintenance Cycle (pages)
Clean
Replace
100,000
100,000
100,000
100,000
Maintenance Cycle (pages)
Clean
Replace
60,000
Maintenance Cycle (pages)
Clean
Replace
16,000
15,000
Maintenance Cycle (pages)
Clean
Replace
100,000
5-2
Reference
QTY
Page
1
5-22
1
5-22
1
5-24
1
5-28
1
5-29
1
5-30
1
5-23
1
5-31
Reference
QTY
Page
1
5-39
1
5-41
1
5-40
1
5-38
Reference
QTY
Page
1
5-37
Reference
QTY
Page
1
See
Operating
1
Instructions
Reference
QTY
Page
1
5-37

Advertisement

Table of Contents
loading

Table of Contents