Decommissioning All Ports On A Switch Or Blade - Brocade Communications Systems StoreFabric SN6500B User Manual

Brocade network advisor san user manual v12.0.0 (53-1002696-01, march 2013)
Hide thumbs Also See for StoreFabric SN6500B:
Table of Contents

Advertisement

Decommissioning all ports on a switch or blade

NOTE
(Virtual Fabrics only) All ports on the blade must be managed by the Management application.
NOTE
Fabric tracking must be enabled (refer to
decommissioned port details (such as port type, device port wwn, and so on). Do not accept
changes in the Management application client.
1. Select the switch or logical switch for which you want to decommission all ports, then select
2. Choose one of the following options:
3. Click OK on the Port Commission Confirmation dialog box.
Brocade Network Advisor SAN User Manual
53-1002696-01
Configure > Port Commissioning > Decommission > All F-Ports on the Switch/Blade.
NOTE
You can only decommission ports from the logical switch, not the physical chassis.
The Port Commission Confirmation dialog box displays.
Apply Default Settings (default) — Select to have the Management application perform one
of the following actions:
The Management application contact all registered CIMOM servers within the fabric
affected by the action and obtains the status from each CIMOM server. If all CIMOM
servers are okay, the Management application sends a CAL Request to decommission the
port. If even one CIMOM server is not okay, decommissioning fails.
Force — Select to force the port decommission.
The Management application still contacts all registered CIMOM servers within the fabric
affected by the action, but forces the port decommission regardless of the CIMOM server
response.
NOTE
If the CIMOM server is not reachable or the credentials fail, port decommission does not
occur.
While decommissioning is in progress, a down arrow icon displays next to the port icon in the
Product List. You can view the port commissioning results in the deployment reports (refer to
"Port commissioning deployment report"
When the decommission is complete, an application event displays in the Master Log detailing
success or failure.
Port commissioning overview
"Enabling fabric tracking"
on page 376).
12
on page 132) to maintain the
375

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Brocade network advisor 12.0.0

Table of Contents