Verification Procedure - Omron 3G3MV-PDRT2 User Manual

Devicenet communications units
Table of Contents

Advertisement

Example System Startup

Verification Procedure

Use the following procedure to operate the Inverter and verify proper operation.
The operational check is performed with the Inverter's forward reference. Thoroughly confirm the
safety of the equipment before operating the system.
Note Refer to the preceding page for details on the contents of each word.
000000
CT00
03303
0010
03203
0000
03303
0010
03203
0060
03303
0070
03204
0000
03303
0070
03204
1388
03303
0070
03203
0060
03303
0070
03203
0060
03303
0074
03203
0060
03303
0070
Monitor word 3303.
3
CLR
CH
SHIFT
Display word 3203 in the same window.
3
2
CH
SHIFT
Write the value 0060 (Net Ctrl. = 1 and Net Ref. = 1) to word 3203 to enable the network.
0
0
6
CHG
Change word 3303 (Ref. From Net = 1 and Ctrl. From Net = 1) to confirm rights to the
communications reference.
A frequency of 0.00 will be displayed in the data display on the front of the Inverter.
Display word 3204.
Input 50.00 Hz (5,000 decimal = 1388 hexadecimal) to word 3204 to change the
frequency reference.
1
3
8
CHG
A frequency of 50.00 will be displayed in the data display on the front of the Inverter.
Verify the frequency.
Return to the display of word 3203.
Input the forward reference (Net Ctrl. = 1, Net Ref. = 1, and RUN/STOP = 1) to word
3203 to input the forward reference.
0
0
6
CHG
The "During forward run" flag will go ON in word 3303.
Turn OFF the forward reference and reverse reference in word 3203 (Net Ctrl. = 1,
Net Ref. = 1, Forward/Stop = 0, Reverse/Stop = 0) to input the stop reference.
0
0
6
CHG
The "During forward run" flag will go OFF in word 3303. Verify that operation stops.
3
0
3
MONTR
0
3
MONTR
0
WRITE
8
WRITE
1
WRITE
0
WRITE
Chapter 2
2-15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

3g3rv-pdrt2

Table of Contents