Nortel DMS-100 Series Maintenance Manual page 592

Star remote system
Hide thumbs Also See for DMS-100 Series:
Table of Contents

Advertisement

13-34 Star Remote System routine maintenance procedures
Testing ac/dc rectifier voltages
RLD
Application
Use this procedure to test ac/dc rectifier voltages for the Star Module.
Interval
Perform this procedure once every 6 months.
Common procedures
Not applicable
Action
The flowchart that follows provides a summary of this procedure. Use the
instructions in the step-action procedure that follows the flowchart to perform
the routine maintenance procedure.
297-8353-550 Standard 05.01 March 2001

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents