Requirements
The coordination of the components of the motor circuit requires the following:
The let-through current I
In case of low-voltage supply via a control transformer, short-circuit currents ranging above the limit
breaking capacity must be interrupted within 80 ms. This requirement does not apply if
the mechanical latch is provided
or
the opening times have been extended so much that – in the a.m. current range – the contactor
can only open when the fuse-link has interrupted the current.
Due to the arising motor starting current, the instant when the motor starts represents the maximum
stress for the HV HRC fuse-link. This stress must neither operate nor pre-damage the fuse-link.
Other factors of influence on the stress of the HV HRC fuse-links are the starting time and the
starting frequency of the motors.

14.22 Replacing protection fuse-links for the control transformer

Arrangement of protection fuse-links
The control transformer (2) is equipped with 2 protection fuse-links (1). The protection fuse-links are only
accessible after removing the HV HRC fuse-links from the outer phases.
Fig. 356: Rear side of truck: Arrangement of
protection fuse-links for control transformer
110-0134.9 / 14
Operating the contactor panel with panel width 600 mm
must not exceed 46 kA at 7.2 kV.
D
1
2
NXAIR / ≤ 40 kA