Siemens NXAIR Operating Instructions Manual page 406

Air-insulated switchgear ≤ 17.5 kv / ≤ 40 ka / ≤ 4000 a busbar current
Hide thumbs Also See for NXAIR:
Table of Contents

Advertisement

Panels with motor operating mechanism control
Fig. 733: Circuit-breaker type 3AE1:
Inspection window for circuit-breaker
position and closing spring state
in control door
The procedures for charging / discharging the spring energy store manually in panels with motor operating
mechanism control are identical with the procedures in panels without motor operating mechanism control.
For charging / discharging the spring energy store manually, see chapters 10.14 and 10.15
406
,
Fig. 734: Circuit-breaker type 3AE5:
NOTICE
Conflicting operation
The requirement of setting the panel to either local or remote control prevents
operating the panel locally and centrally at the same time.
For any local operations ─ manual or electrical ─ set the panel to local
control, for example by switching the local-remote switch to LOCAL
position.
NOTICE
Covered control elements
For
safety
reasons,
charging / discharging the spring energy store are covered by the control door.
Open the control door to uncover the actuating openings on the high-
voltage door.
NXAIR / ≤ 40 kA
Inspection window for circuit-breaker
position and closing spring state
in control door
some
of
the
actuating
openings
involved
in
.
110-0134.9 / 14

Hide quick links: