Accessing the connection compartment through the front
Tighten the front bolts at the base frame hand-tight. Tighten the bolts with a tightening torque
of 25 Nm.
Fig. 595: 2 bolted joints on base frame front
Tighten the lateral bolts M8x20 at the vertical partition and the base frame hand-tight.
Tighten the bolts with a tightening torque of 25 Nm. Proceed in the same way on the other
side.
Fig. 596: 6 bolted joints fixed laterally on
Tighten the upper bolts M8x20 at the vertical partition hand-tight. Tighten the bolts with a
tightening torque of 25 Nm.
Fig. 597: 4 bolted joints on partition