Operating the contactor panel with panel width 600 mm
Preconditions
•
Contactor truck with the same coding as panel available
•
Coupling pin of the operating shaft in vertical position
•
High-voltage door open
•
Low-voltage connector stowed away
•
Auxiliary voltage for the panel disconnected
Fig. 334: Panel prepared to insert contactor truck
Procedure
Move the contactor truck centrally in front of the panel. The rollers (1) of the contactor truck
point towards the guide rails (2) at the bottom of the panel.
Fig. 335: Contactor truck in front of panel
186
NXAIR / ≤ 40 kA
110-0134.9 / 14