Siemens NXAIR Operating Instructions Manual page 5

Air-insulated switchgear ≤ 17.5 kv / ≤ 40 ka / ≤ 4000 a busbar current
Hide thumbs Also See for NXAIR:
Table of Contents

Advertisement

10.9
10.10 Closing the circuit-breaker electrically ........................................................................................................... 53
10.11 Opening the circuit-breaker electrically .......................................................................................................... 54
10.12 Closing the circuit-breaker manually .............................................................................................................. 55
10.13 Opening the circuit-breaker manually ............................................................................................................ 58
10.14 Discharging the spring energy store .............................................................................................................. 60
10.15 Charging the spring energy store manually ................................................................................................... 61
10.16 Earthing the feeder manually ......................................................................................................................... 64
10.17 De-earthing the feeder manually .................................................................................................................... 66
10.18 Removing the low-voltage connector ............................................................................................................. 69
10.19 Plugging on the low-voltage connector .......................................................................................................... 70
10.20 Taking the withdrawable circuit-breaker out of the panel ............................................................................... 72
10.21 Inserting the withdrawable circuit-breaker in a panel ..................................................................................... 77
10.22 Taking the circuit-breaker truck out of the panel ............................................................................................ 86
10.23 Inserting the circuit-breaker truck in a panel .................................................................................................. 89
11 Operating the disconnecting panel ....................................................................................................... 98
11.1
Control elements at the front side of the panel .............................................................................................. 98
11.2
Position indicators visible on high-voltage door ............................................................................................. 98
11.3
Access to compartments ............................................................................................................................... 99
11.4
Opening or closing the high-voltage door ...................................................................................................... 99
11.5
Racking the withdrawable disconnector link / disconnector truck .................................................................. 99
11.6
Removing or plugging on the low-voltage connector ................................................................................... 101
11.7
11.8
Earthing or de-earthing the feeder manually ................................................................................................ 101
11.9
Design of the withdrawable disconnector link / disconnector truck .............................................................. 101
12 Operating the metering panel .............................................................................................................. 102
12.1
Control elements at the front side of the panel ............................................................................................ 102
12.2
Position indicator visible on high-voltage door ............................................................................................. 102
12.3
Access to compartments ............................................................................................................................. 103
12.4
Opening or closing the high-voltage door .................................................................................................... 103
12.5
Racking the withdrawable metering part / metering truck ............................................................................ 103
12.6
Removing or plugging on the low-voltage connector ................................................................................... 103
12.7
12.8
Replacing protection fuse-links .................................................................................................................... 104
13 Operating the contactor panel with panel width 435 mm ................................................................. 109
13.1
Control elements at the front side of the panel ............................................................................................ 109
13.2
Position indicator visible on high-voltage door ............................................................................................. 110
13.3
Access to compartments ............................................................................................................................. 110
13.4
Opening the high-voltage door..................................................................................................................... 110
13.5
Closing the high-voltage door ...................................................................................................................... 111
13.6
Positions of the contactor truck .................................................................................................................... 113
13.7
Racking the contactor truck to service position ............................................................................................ 114
13.8
Racking the contactor truck to test position ................................................................................................. 116
13.9
Closing the contactor electrically ................................................................................................................. 118
13.10 Opening the contactor electrically ................................................................................................................ 118
13.11 Opening the contactor manually .................................................................................................................. 119
13.12 Manual emergency opening of the contactor ............................................................................................... 121
13.13 Operating conditions without auxiliary voltage ............................................................................................. 122
13.14 Earthing the feeder manually ....................................................................................................................... 125
13.15 De-earthing the feeder manually .................................................................................................................. 127
13.16 Taking the contactor truck out of the panel .................................................................................................. 129
13.17 Inserting the contactor truck in a panel ........................................................................................................ 133
13.18 Replacing HV HRC fuse-links ...................................................................................................................... 138
13.19 Motor starting currents ................................................................................................................................. 146
13.20 Coordinating the components of the motor circuit........................................................................................ 146
14 Operating the contactor panel with panel width 600 mm ................................................................. 148
14.1
Control elements at the front side of the panel ............................................................................................ 148
14.2
Position indicators visible on high-voltage door ........................................................................................... 149
14.3
Access to compartments ............................................................................................................................. 149
14.4
Opening the high-voltage door..................................................................................................................... 150
14.5
Closing the high-voltage door ...................................................................................................................... 151
14.6
Positions of the contactor truck .................................................................................................................... 153
14.7
Racking the contactor truck to service position ............................................................................................ 154
14.8
Racking the contactor truck to test position ................................................................................................. 157
14.9
Closing the contactor electrically ................................................................................................................. 160
14.10 Opening the contactor electrically ................................................................................................................ 161
14.11 Opening the contactor manually .................................................................................................................. 162
14.12 Operating conditions without auxiliary voltage ............................................................................................. 164
110-0134.9 / 14
NXAIR / ≤ 40 kA
Content
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents