Earthing and de-earthing the busbar system
After turning the operating lever to the end position, the position indicator of the busbar
earthing switch changes from the intermediate position to the OPEN position.
Fig. 521: Operating lever in end position
Remove the operating lever.
To close the actuating opening, push the operating slide down as far as it will go.
Fit a padlock to the operating slide and close it.
The busbar earthing switch has been switched from the CLOSED position to the OPEN
position, thus de-earthing the busbar. The position indicator of the busbar earthing switch
changes from the CLOSED position via the intermediate position to the OPEN position.
Fig. 522: Operating slide on
The busbar system is de-earthed.
282
busbar earthing switch padlocked