6 B - 6
1968 P O N T I A C SERVICE M A N U A L
Fig. 6B-8
Removing Float Hinge Pin
8. Remove power piston and power piston spring
from air horn,
NOTE:
Do not remove idle pick-up tube from
air
horn as it is pressed
in place.
The
anti-bubble
screen
located inside the main well should not be
removed.
Clean and blow out dry with
compressed
air only.
9. Remove air horn gasket.
DISASSEMBLY
OF FLOAT
BOWL
1. Using pair of long nosed pliers, remove pump
discharge guide (Fig. 6B-12). Pump discharge spring
and ball may now be removed by inverting bowl and
shaking into palm of hand.
MAIN METERING JET
Fig. 6B-10
Removing Main Metering Jet
3. Remove pump plunger from float bowl by pull
ing straight upward (Fig. 6B-13).
4. Remove pump return spring from bottom of
pump well (Fig. 6B-14).
NOTE:
Do not remove vacuum break suction tube
from throttle body.
5. Place carburetor bowl with suction tube pro
jected over edge of flat surface and remove two
throttle body attaching screws. Throttle body and
gasket may now be removed.
2. Remove two hair pin clips from pump link and
then remove pump link from throttle lever and pump
plunger rod.
DISASSEMBLY
OF THROTTLE
BODY
l
e
Remove
idle
mixture
adjusting needle and
spring.
P O W E R
C H E C K
V A L V E
B A L L
R E T A I N E R
Fig. 6 B - 9
Removing Float Needle Seat
Fig. 6B-11
Removing Power Check V a l v e Ball Retainer