Pontiac tempest 1968 Service Manual page 118

Table of Contents

Advertisement

REAR SUSPENSION
4-15
Fig. 4 - 2 1
Installing V a l v e Tension Spring in Boss
3. Remove weight.
Car should begin to settle in
6-18 seconds. Final position should be within 1/2"
of original measurement.
AUTOMATIC
LEVEL
CONTROL
TEST
GAGE
To properly service the Automatic Level Control,
it will be necessary to obtain Test Gage J 5907 with
adaptor package J 22695 or equivalent. A test gage
can be made up by collecting and assembling the
following parts:
PARTS REQUIRED
1. F i l l valve.
2. A tee, which has three 1/8" female taper pipe
threads.
3. One adapter, which has a 1/4" female taper pipe
thread on one end and a 1/8" male taper pipe thread
on the other end.
Fig. 4-22
Positioning Distributor V a l v e
Fig. 4-23
Installing Distributor Arm
4. Air Pressure Gage J 5907.
5. One male connector, which has a 1/8" male
taper pipe thread on one end and a 3/8"-24 straight
thread male thread on the other end.
6. Two metal sleeves, rubber seals and tube nuts.
7. A length of 1/8" tubing.
ASSEMBLY
1. Install adapter in tee.
2. Install connector in one end of tee.
3. Install fill valve in other end of tee.
4. Install Pressure Gage J 5907 in adapter.
13/16" DEEP SOCKET—>
Fig. 4-24
Installing Diaphragm Retainer

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Firebird 1968

Table of Contents