Connecting the Control Unit to Earth Ground

To connect the system to earth ground, perform the following steps:
Step
1.
Connect the earth ground post inside the transformer enclosure to a good earth ground (use
grounding methods specified in the National Electric Code).
2.
Use a green nut (supplied) to secure the green ground wire to the ground post. The earth ground
wire should be the only wire under this nut.
3.
Run 16AWG wire from this post through conduit into the control unit enclosure.
4.
Take a ring terminal harness and cut it in half. Connect the wire end of the ring terminal harness
with a wire nut to the 16AWG wire from the conduit and take the ring terminal end and place it
under the mounting plate screw. See Figure 2-6.
5.
Take the other end of the ring terminal harness and insert the bare wire end into the ground
(GND) terminal block on the main PCB and place the ring end under the mounting plate screw.
See Figure 2-6.
6.
To ground the cabinet door to the cabinet take the ring terminal harness and place both ends on
the mounting post on the door and cabinet and secure it with a washer and green nut. See
Figure 2-6.
Note: Keep power
limited and non-power
limited wires a
minimum of ¼" apart.
TRANSFORMER
WIRES MUST
GND WIRE (GRN)
NUT (GRN)
AND LOCKWASHER
CABINET DOOR

Power Requirements

The GX-Series uses 1451 power supply as the primary power source. Because the system power is
distributed over the RS-485 buses, it is important to keep the voltage drops along the buses to a minimum.
Good installation practices will go a long way toward minimizing both the effect of the voltage drops and the
need for adding an external power unit.
Where additional power is needed, an Electronic Security Devices (ESD) SPS-6E power supply can be
introduced at sections of the bus. The power supply will provide power for its associated device and for
additional sections of the RS-485 bus, as well.
RUN BELL WIRES
IN CONDUIT
1/2" RING
TERMINAL
HARNESS
WIRE
NUT
BE RUN IN
CONDUIT
Figure 2-6. Installing the Control
Action
PLATE MOUNTING
SCREWS (2)
PC
BOARD
ON
ON
1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8
N/O
C N/C
PLATE
PLATE MOUNTING
SCREWS (2)
2-6
DOOR TAMPER
SWITCH LOCATION
CABINET
GND
1/2" RING
TERMINAL
HARNESS
REAR TAMPER
SWITCH LOCATION