Option 55 - Soak - Honeywell GX-Series Installation And Setup Manual

Gx series;
Table of Contents

Advertisement

GX-Series Control Panel Installation and Setup Guide
Option 55 – Soak
The Soak option allows selected zones to be put onto test for a period ranging from 1 – 14 days (refer to
option 51.16=PARAMETERS.Soak Time). Activations from a zone on the soak test do not cause alarms
but are recorded in the event log and are reported to type 2 (and above) users on unsetting (disarming) of the
system. The zone remains on soak test until the selected number of days has passed without any alarm
activation, the zones then resume normal operation – that it, activations result in alarms being generated.
The Soak Time is reset to the full number of days if there is an alarm activation on any of the selected
zones.
NOTE: The Soak Time starts when the first zone is put onto soak test; subsequent additions are only tested for
the period remaining in the Soak Time. Parameter 51.16, Soak Time must be programmed before
activating any zones in to the soak test. The period remaining decreases by one day each day at 0900
hours.
Activation of an Exit or Video Exit zone during the Entry time does not reset the soak test and period.
Programming Soak Zones
On selecting the Soak option, the address and function of the first zone on the system is displayed. Move to
the required zone by pressing the A> or <B keys or by entering the zone address. To place the zone on the
soak test press the # key; the keypad indicates that the zone is now ON TEST. Select other zones to be put
on soak test in the same way. Once all the zones have been selected, press the esc key; the keypad briefly
displays the number of days remaining in the Soak Time parameter before escaping from the Soak
operation.
6-82

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gx-520Gx-48

Table of Contents