Using Manual Update Editor With True Symbols; Manual Update Planning - Furuno FCR-2107 Series Operator's Manual

Marine radar/arpa
Hide thumbs Also See for FCR-2107 Series:
Table of Contents

Advertisement

8. Manual Updates
8.5

Using Manual Update Editor with True Symbols

.
8.5.1

Manual update planning

The manual update editor operates in sessions. You create a session when you activate the Manual Update Planning
dialog box. You can freely delete, modify, copy or create chart objects until you feel finished with your session.
Then, you terminate your session by clicking the Accept Manual Updates as Permanent button and the chart radar
stores your manual updates permanently. If you need to leave your manual update session and discard all
modifications made during the current session, click X in upper right corner.
Note: The manual update editor is only available in the North Up or Course Up orientation mode.
New, Copy, Modify, Delete: These buttons are used to collect chart objects into a list shown in a Manual Update
Planning dialog box for further editing during current session of manual update planning. New creates an object
from scratch. Copy creates an object using an existing object as an example. Modify changes an existing object.
Delete removes an existing object.
Remove from List: If you made a manual update by mistake, you can remove it if you haven't accepted it yet as
permanent. You can remove it by choosing (highlighting) chart object in the List then clicking the Remove from
List button.
Edit Properties: You can edit properties of chosen (highlighted) chart object by using the Edit Properties button.
8-12
The manual update editor has the choices shown below and you can choose one
by choosing Manual Updates from the Chart menu.
Planning: Operate with new manual updates.
Undo Last: Remove last accepted manual update planning session. By
repeating Undo Last you can remove any amount of old manual update planning
session.
Clear: Remove all manual updates in a single operation.
Backup and Restore: Make a backup or recall already recorded backup. •
With an ARCS chart, you also have "Set chart viewing dates" to set viewing
date of manual updates. Note that with S57 charts "Set chart viewing dates" is in
the Chart menu.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents