Visually inspect ENC
for changes.
- Added objects are marked
with orange circles.
- Deleted objects are marked
with orange slash marks.
- Modified objects are marked
with both orange circles and
slash marks.
During SENC conversion,
the system sets Display
Until date for the current
system date.
Yes
Do you want to see changes
Approve loaded changes by
setting Approve Until to
current date.
- Open Date Dependent.
- Select "All".
- Set Approve Until current
date.
How to load S57 charts into chart radar (continued)
POINT 1
before approving them?
No
Loaded ENCs are ready
for use.
7. Vector Chart Material
7-5