3Com SuperStack 4 Configuration Manual page 68

5500g-ei family
Hide thumbs Also See for SuperStack 4:
Table of Contents

Advertisement

80
C
4: P
E
(P
E) C
HAPTER
OWER OVER
THERNET
O
ONFIGURATION
12000 mW. This is required to guarantee the power feeding to the PD that will be
connected to the GigabitEthernet1/0/24 even when the Switch 5500 PWR is in full
load.
Network Diagram
Figure 17 PoE Remote Power Supply
Configuration Procedure
Update the PSE processing software online.
[SW5500]poe update refresh 0290_021.s19
Enable the PoE feature on the GigabitEthernet1/0/1, GigabitEthernet1/0/2, and
GigabitEthernet1/0/24 ports (the feature is enabled by default, so this step can be
ignored).
[SW5500-GigabitEthernet1/0/1]poe enable
[SW5500-GigabitEthernet1/0/2]poe enable
e
[SW5500-GigabitEthernet1/0/24]poe enabl
Set the maximum power output of GigabitEthernet1/0/1 and
GigabitEthernet1/0/2 to 12000 and 3000 mW respectively.
[SW5500-GigabitEthernet1/0/1]poe max-power 12000
[SW5500-GigabitEthernet1/0/2]poe max-power 3000
Set the priority of GigabitEthernet1/0/24 to
to guarantee the power
critical
feeding to the AP to which this port connects.
[SW5500-GigabitEthernet1/0/24]poe priority critical
Set the power supply management mode on the switch to
(it is the default
auto
mode, so this step can be ignored).
[SW5500]poe power-management auto
Enable the PD compatibility detect of the switch to allow the switch to supply
power to part of the devices noncompliant with the 802.3af standard.
[SW5500]poe legacy enable

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Superstack 4 5500g-ei series

Table of Contents