Verifying Proper Operation; Replacing A Controller Blower; Before You Begin; Installing A Battery - HP StorageWorks 6100 - Enterprise Virtual Array User Manual

Hp storageworks 4x00/6x00/8x00 enterprise virtual array user guide (5697-8037, april 2009)
Hide thumbs Also See for StorageWorks 6100 - Enterprise Virtual Array:
Table of Contents

Advertisement

Figure 41 Installing a battery

Verifying proper operation

After replacing the battery, check the following to verify that the component is operating properly:
NOTE:
It may take up to 10 minutes for the component to display good status.
Check the battery status indicators. See
• During the first minute, both status indicators may be on or flashing.
• The status indicator (1) should then begin flashing, indicating the battery is charging. It may
take several hours for a new battery to fully charge. The fault indicator (2) should be off during
charging.
After checking the status indicator, install the front panel on the enclosure by pressing it firmly into
place.
From HP Command View EVA:
• Navigate to the component and check the status. It should be
• Turn off the locate function by clicking Locate > Locate Off .

Replacing a controller blower

This section describes the procedure for replacing the blower.

Before you begin

Observe the following precautions when replacing a blower.
CAUTION:
Removing a blower significantly changes the air flow within the enclosure.
Both blowers must be installed for the enclosure to cool properly. If a blowers fails, leave it in
place in the enclosure until a new blower is available to install.
Parts can be damaged by electrostatic discharge. Use proper anti-static protection.
HP StorageWorks 4x00/6x00/8x00 Enterprise Virtual Array user guide
Table
29.
.
109