Power-On Procedure - HP 316095-B21 - StorageWorks Edge Switch 2/24 Service Manual

Fw 05.01.00 and sw 07.01.00 edge switch 2/24 service manual
Hide thumbs Also See for 316095-B21 - StorageWorks Edge Switch 2/24:
Table of Contents

Advertisement

Power-On Procedure

To power-on the switch:
1. One alternating current (AC) power cord is required for each power supply.
2. Plug the power cord(s) into facility power sources and power supply AC
3. During POSTs:
1. After successful POST completion, the green power (PWR) LED remains
2. If a POST error or other malfunction occurs, go to
Edge Switch 2/24 Service Manual
Ensure power cord(s) are available to connect the switch to facility power.
WARNING:
A Hewlett-Packard-supplied power cord is provided for each
switch power supply. To prevent electric shock when connecting the switch to
primary facility power, use only the supplied power cord(s), and ensure the
facility power receptacle is the correct type, supplies the required voltage, and is
properly grounded.
connectors at the rear of the switch. When the first power cord is connected,
the switch powers on and performs power-on self-tests (POSTs).
— The green power (PWR) LED on the switch front panel illuminates.
— The amber system error (ERR) LED on the switch front panel blinks
momentarily while the switch is tested.
— The green LEDs associated with the Ethernet port blink momentarily
while the port is tested.
— The blue/green and amber LEDs associated with the ports blink
momentarily while the ports are tested.
illuminated and all amber LEDs extinguish.
on page 33 to isolate the problem.
Repair Information
"MAP 0000: Start
MAP"
155

Advertisement

Table of Contents
loading

Table of Contents