SFF drive
5. Determine the status of the drive from the drive LED definitions .
6. Install the front bezel .
7. To configure drive arrays, see the relevant storage controller guide .
Results
Results
The installation is complete.
Power supply options
Power supply options
HPE ProLiant ML110 Gen11 Server User Guide
72