14. Connect the drive power and SATA cables .
15. Make sure that all the system cables that are routed through the front cable channel are properly secured in the metal cable tabs and
cable clamps.
16. Install the system air baffle .
17. Install the access panel .
18. Do one of the following:
Orient the server back to tower mode.
Install the server into the rack.
19. Install the front bezel .
20. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
21. Power up the server.
22. To configure drive arrays, see the relevant storage controller guide .
Results
Results
The installation is complete.
Installing a hot-plug LFF/SFF drive
Installing a hot-plug LFF/SFF drive
Prerequisites
Prerequisites
The redundant fan kit is required when installing SFF drives with the following specifications:
15K RPM hard disk drives
24G SAS-4 solid state drives
HPE ProLiant ML110 Gen11 Server User Guide
69