10. Install the 4 LFF hot-plug drive cage:
a. Install the drive cage in the drive box bay.
b. Install the drive cage screws.
11. If you are installing the second 4 LFF hot-plug drive cage option, repeat steps 10 and 11 on the Box 2.
12. Connect all following drive cables:
LFF hot-plug drive controller cables
Drive power cable
13. Make sure that all the system cables that are routed through the front cable channel are properly secured in the metal cable tabs and
cable clamps.
HPE ProLiant ML110 Gen11 Server User Guide
91