6. Install the server into the rack.
Install the server
Install the
server into the
into the rack
Prerequisites
Prerequisites
Get help to lift and stabilize the server during rack installation. If the
might be required to help install the server
might be required to help install the
Before you perform this procedure, review the:
Rack warnings and cautions
Server warnings and cautions
Space and airflow requirements
A fully populated server is heavy. Hewlett Packard Enterprise recommends removing the external chassis components before installing
the server into a rack.
Before you perform this procedure, make sure that you have a T-15 Torx screwdriver available.
Procedure
Procedure
1. Grasp the tray notch to slide the tray out of the rack.
rack
If the server
server: : One person to support the server weight, and the other to slide the server into the rack.
server is installed higher than chest level, an additional person
is installed higher than chest level, an additional person