HPE ProLiant ML110 Gen11 User Manual page 119

Table of Contents

Advertisement

cable clamps.
14. Install the system air baffle .
15. Install the access panel .
16. Do one of the following:
Orient the server back to tower mode.
Install the server into the rack.
17. Connect all peripheral cables to the server.
18. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
19. Power up the server.
Results
Results
The installation is complete.
Installing the secondary riser
Installing the secondary riser
Prerequisites
Prerequisites
Before you perform this procedure, make sure that you have a T-10 Torx screwdriver available.
About this task
About this task
CAUTION:
CAUTION: A discharge of static electricity from a finger or other conductor might damage system boards or other static-
sensitive devices. To prevent damage, observe antistatic precautions.
Procedure
Procedure
1. Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Disconnect all peripheral cables from the server.
4. Do one of the following:
If the server is in tower mode, place the server on a flat, level surface with the access panel facing up .
If the server is in rack mode, remove the server from the rack.
5. Remove the access panel .
6. Remove the system air baffle.
HPE ProLiant ML110 Gen11 Server User Guide
119

Advertisement

Table of Contents
loading

Table of Contents