HPE ProLiant ML110 Gen11 User Manual page 128

Table of Contents

Advertisement

Before you perform this procedure, make sure that you have the following items available:
Compatible controller cable
T-10 Torx screwdriver
T-15 Torx screwdriver
Spudger or any small prying tool
About this task
About this task
CAUTION:
CAUTION:
The port blank provides EMI shielding and helps maintain proper thermal status inside the server. Do not operate the server
when a port blank is removed without the corresponding I/O port option installed.
CAUTION:
CAUTION: A discharge of static electricity from a finger or other conductor might damage system boards or other static-
sensitive devices. To prevent damage, observe antistatic precautions.
Procedure
Procedure
1. Back up all server data.
2. Power down the server.
3. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4. Disconnect all peripheral cables from the server.
5. Do one of the following:
If the server is in tower mode, place the server on a flat, level surface with the access panel facing up .
If the server is in rack mode, remove the server from the rack.
6. Remove the access panel .
7. Remove the system air baffle.
HPE ProLiant ML110 Gen11 Server User Guide
128

Advertisement

Table of Contents
loading

Table of Contents