HPE ProLiant ML110 Gen11 User Manual page 97

Table of Contents

Advertisement

11. Slide the RDX docking station into the media bay until it clicks into place.
12. Connect the USB RDX docking station power and signal cables .
13. Make sure that all the system cables that are routed through the front cable channel are properly secured in the metal cable tabs and
cable clamps.
14. Install the system air baffle .
15. Install the access panel .
16. Do one of the following:
Orient the server back to tower mode.
Install the server into the rack.
17. Install the front bezel .
18. Connect the power cords:
HPE ProLiant ML110 Gen11 Server User Guide
97

Advertisement

Table of Contents
loading

Table of Contents