Remove the server
Remove the
server from the
from the rack
Prerequisites
Prerequisites
Get help to lift and stabilize the server during removal from the rack. If the
person might be required to help remove the server
person might be required to help remove the
the rack.
Before you perform this procedure, review the:
Rack warnings and cautions
Server warnings and cautions
A fully populated server is heavy. Hewlett Packard Enterprise recommends removing the external server components before removing
the server from the rack.
Before you perform this procedure, make sure that you have a T-15 Torx screwdriver available.
Procedure
Procedure
1. Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Disconnect all peripheral cables from the server.
4. Slide the server tray out of the rack:
a. Loosen the server tray thumbscrews.
b. Grasp the tray notch and slide the server out of the rack.
rack
server: : One person to support the server weight, and the other to slide the server out of
If the server
server is installed higher than chest level, an additional
is installed higher than chest level, an additional