14. Connect the SATA-power cable to the optical drive.
15. Install the optical drive cage:
a. Slide the optical drive cage into the optical drive bay until it clicks into place.
b. Install the optical drive cage screws.
16. Connect all following cables to the system board:
Optical drive cable
Front I/O cable
17. Make sure that all the system cables that are routed through the front cable channel are properly secured in the metal cable tabs and
cable clamps.
HPE ProLiant ML110 Gen11 Server User Guide
101