c. Carefully press the SSD down to the horizontal position.
d. Tighten the SSD jack screw.
10. Make sure that all the system cables that are routed through the front cable channel are properly secured in the metal cable tabs and
cable clamps.
11. Install the system air baffle .
12. Install the access panel .
13. Do one of the following:
Orient the server back to tower mode.
Install the server into the rack.
14. Connect all peripheral cables to the server.
15. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
16. Power up the server.
17. To configure the M.2 SSDs, see the Intel Virtual RAID on CPU for HPE Gen11 User Guide at https://hpe.com/support/VROC-Gen11-UG
Results
Results
The installation is complete.
https://hpe.com/support/VROC-Gen11-UG.