Procedure
1. Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Do one of the following:
•
Extend the server from the rack.
•
Remove the server from the rack.
4. Remove the access panel.
5. Remove the riser cage.
6. Install the drive.
The installation is complete.
Power supply options
Hot-plug power supply calculations
For hot-plug power supply specifications and calculators to determine electrical and heat loading for the server, see the
Hewlett Packard Enterprise Power Advisor website (https://www.hpe.com/info/poweradvisor/online).
Installing a redundant hot-plug power supply
CAUTION: All power supplies installed in the server must have the same output power capacity. Verify that all
power supplies have the same part number and label color. The system becomes unstable and might shut down if it
detects different power supplies.
Hardware options installation
65