HPE ProLiant ML110 Gen11 User Manual page 92

Table of Contents

Advertisement

14. Install the system air baffle .
15. Install the access panel .
16. Do one of the following:
Orient the server back to tower mode.
Install the server into the rack.
17. Install the LFF hot-plug drive .
18. Install the front bezel .
19. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
20. Power up the server.
Results
Results
The installation is complete.
Installing the 8 SFF hot-plug drive cage option
Installing the 8 SFF hot-plug drive cage option
Prerequisites
Prerequisites
Before you perform this procedure, make sure that you have a T-15 Torx screwdriver available.
About this task
About this task
The server supports the 8 LFF hot-plug drive cage option. This option:
Can be installed in boxes 1 or 2
Can be installed together with the 4 LFF hot-plug drive cage option
Supports different SAS / SATA drive backplane options
CAUTION:
CAUTION: To prevent improper cooling and thermal damage, do not operate the server unless all bays are populated with
either a component or a blank.
CAUTION: A discharge of static electricity from a finger or other conductor might damage system boards or other static-
CAUTION:
sensitive devices. To prevent damage, observe antistatic precautions.
Procedure
Procedure
1. Back up all server data.
2. Power down the server.
3. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4. Disconnect all peripheral cables from the server.
5. If installed, remove the front bezel .
6. Do one of the following:
HPE ProLiant ML110 Gen11 Server User Guide
92