12. Install the redundant power supply cage.
13. Install the rail.
14. Install the access panel.
15. Install the server into the rack.
16. Install a hot-plug power supply in power supply bay 1.
17. If enabling power redundancy in the server, install a second power supply in power supply bay 2.
18. Power up the server on page 23.
19. If removed, install the bezel.
The installation is complete.
Power supply options
Depending on the installed options and the regional location where the server was purchased, the server can be
configured with one of the following power supplies.
Hot-plug power supply calculations
For hot-plug power supply specifications and calculators to determine electrical and heat loading for the server, see the
Hewlett Packard Enterprise Power Advisor website (http://www.hpe.com/info/poweradvisor/online).
Installing a hot-plug AC power supply
Procedure
1. Access the product rear panel.
2. Remove the power supply blank.
Hardware options installation
49