Download Print this page

Items To Check When Unpacking - Omron OMNUC G Series User Manual

Ac servomotors/servo drives with built-in mechatrolink-ii communications
Hide thumbs Also See for OMNUC G Series:

Advertisement

Items to Check When Unpacking

Check the following items after removing the product from the package.
• Has the correct product been delivered?
• Has the product been damaged in shipping?
 Accessories Provided with Product
Safety Precautions document  1
• No connectors or mounting screws are provided. They have to be prepared by the user.
• Should you find any problems (missing parts, damage to the Servo Drive, etc.), please contact
your local sales representative or OMRON sales office.
Specifications
Single-phase
100 VAC
Single-phase/
3-phase
200 VAC
3-phase 200
VAC
Connector for main
circuit power supply
terminals and control
circuit power supply
terminals
50 W
100 W
200 W
400 W
100 W
200 W
400 W
750 W
1 kW
1.5 kW
2 kW
3 kW
5 kW
7.5 kW
Items to Check When Unpacking
Connector for External
Regeneration Resistor
connection terminals
and Motor connection
terminals
Included
Mounting
Brackets
Included
11

Advertisement

loading