1-2-2 Unpacking and setting of the machine
(1) Installation procedures
Remove the tapes and spacer
Install the optional paper feeder
Install the toner container
Switch the cassette heater switch
Attaching the language label
(Excluding 240V AC)
Install the other optional devices
Release the scanner lock
Service Manual
Start
Unpack
Load paper
Connect the power cord
Execution of initial-setting operation
Execution of mentenance item U952
Set cassette heater control
Output an own-status report
Exit maintenance mode
Print out the user setting list
Completion of the machine installation
1-2-2
(maintenance item U327)
Setting the delivery date
(maintenance item U278)
(maintenance item U000)
Clearing the counter
(maintenance item U927)
Make test copies
Y118240-1