Step 1 Peel a part of the insulation layer B of a power cable according to the cross-
sectional area of the cable conductor. The conductor C with length L1 appears, as
shown in
Figure 4-98 Peeling a power cable
When peeling the insulation layer of a power cable, do not hurt the metal
conductor of the cable.
Table 4-36 Cross-sectional area of the conductor and value of L1
Cross-sectional Area of Conductor
(mm
1, 1.5, 2.5
4
6
10
16
Step 2 Put the cable conductor into the cord end terminal A. Align the conductor with the
edge of the cord end terminal, as shown in
Issue 05 (2023-03-31)
Figure
4-98. The recommended values of L1 are shown in
NO TICE
2
)
Copyright © Huawei Technologies Co., Ltd.
4 Hardware Installation and Parts Replacement
Value of L1(mm)
7
8
9
11
13
Figure
4-99.
Table
4-36.