Figure 4-21 Writing direction of the label
attaching Labels
After printing or writing the label, remove the label from the bottom page and
attach it to the signal cable, or the identification plate of the power cable.
?.1. Attaching the Label to the Signal Cable
This section describes the positions where the labels should be attached on the
signal cables and the means by which the labels are folded.
Paste the label at the proper position
It is recommended to paste a label at a point 2 cm from the connector.
The steps to attach the label to the cable are shown in
labels should be on the right or top of the cables, according to different cabling
methods. The left part of the figures shows the method to attach the label when
the cable is laid vertically, while the right part of the figures shows the method to
attach the label when the cable is laid horizontally.
Figure 4-22 Sticking the label onto proper position of the signal cable
1. Cable
Issue 05 (2023-03-31)
NO TE
In special cases, for example, to avoid cable bent or affecting other cables, other positions
are allowed to attach the labels.
Stick the label to the proper position on the cable, fold the narrow part of the
label according to the directions shown in
Copyright © Huawei Technologies Co., Ltd.
4 Hardware Installation and Parts Replacement
Figure 4-22
Figure
4-22.
2. Label
The finished