Huawei NE05E Hardware Manual page 505

Table of Contents

Advertisement

HUAWEI NE05E,NE08E
Hardware Guide
Step 4 As shown in
and the conductor by a press-fitting tool.
Figure 4-94 Press-Fitting joint parts of a bare press-fitting terminal and a
conductor
The shapes of press-fit parts may vary with the types of the press-fitting dies.
Step 5 Push the heat shrink tubing A towards the connector till the tube covers the press-
fit part. Heat the heat shrink tubing using a heat gun, as shown in
Figure 4-95 1-5 Heating a heat shrink tubing
Issue 05 (2023-03-31)
Figure
4-94, press-fit the joint parts of the bare press-fitting terminal
NO TE
Copyright © Huawei Technologies Co., Ltd.
4 Hardware Installation and Parts Replacement
Figure
4-95.
497

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ne08e

Table of Contents