● When peeling the insulation layer of a power cable, do not hurt the metal
● If the bare press-fitting terminal is not provided by Huawei, adapt the value of
Table 4-35 Cross-sectional area of the conductor and value of L1
Cross-Sectional Area of
Conductor(mm
1, 1.5, 2.5
4
6
10
16
Step 2 Put the power cable into heat shrink tubing A, as shown in
Step 3 Put the cable conductor into a ring terminal. And keep the ring terminal close to
the insulation layer C of the power cable, as shown in
Figure 4-93 Inserting the cable conductor into the ring terminal
After the conductor is put into the ring terminal, the L2 part will extrude. The
value of L2 should be less than or equal to 2 mm.
Issue 05 (2023-03-31)
NO TICE
conductor of the cable.
L1 according to the actual value L of the terminal. L1 = L + (1-2) mm.
2
)
NO TICE
Copyright © Huawei Technologies Co., Ltd.
4 Hardware Installation and Parts Replacement
Value of L1(mm)
7
8
9
11
13
Figure
Figure
4-93.
4-93.
496