Table 4-1 Equipment installation process
Installation preparation
Unpacking and inspecting equipment
Installing chassis
Installing boards
Installing fibers and cables
Testing E1 cable connections
Checking installation
Powering on the equipment
Issue 05 (2023-03-31)
Installation Process
Copyright © Huawei Technologies Co., Ltd.
4 Hardware Installation and Parts Replacement
Description
Before installation, plan installation
space, build telecommunications
rooms, and determine the installation
mode according to requirements of the
equipment for running environment.
This ensures that the equipment can
be properly installed and
commissioned, and then can run
stably. For details on the requirements
of the equipment for running
environment, see
Preparation.
When a project starts, the project
supervisor needs to work with the
customer to unpack and inspect the
delivered equipment. For details, see
4.1.1.3.1 Unpacking
The installation modes for chassis vary
with installation environment. For
details, see
4.1.1.3.2 Installing
chassis.
Generally, chassis for delivery have
boards installed. If boards are
delivered separately, see
Installing
Boards.
The installation modes for fibers and
cables in chassis vary with installation
environment.
After installing E1 cables, test the E1
cable connections.
After hardware installation is
complete, check the installation to
ensure that the equipment can run
stably.
Before powering on the equipment,
check the external power supply to
ensure proper voltage and fuse
capacity. After powering on the
equipment, observe the indicators to
determine whether the equipment
runs properly.
4.1.1.2 Installation
Inspection.
4.1.1.3.3