Installing Options and Accessories
5.
Reinstall the conduit landing plate.
6.
Install conduit between the UPS and SCM II. See
7.
Install wiring between the UPS and SCM II. See
Bridge Card terminal location and wiring information, and
terminal location and wiring information.
NOTE
8.
Install 120 Vac power wiring from the critical bus to the SCM II. See
the terminal location and wiring information.

Figure 57. Supervisory Contact Module II Terminal Location.

Ground
Terminal
Terminal TB2 Customer
Supervisory Contact Interface
Terminal TB1 Signal
Connections from the UPS
NOTE
9.
Install wiring between the SCM II terminal block TB2 and the monitoring equipment. See
terminal block location and
10. Close the front door and secure the latch.
108
Eaton
®
120 Vac for the SCM II should be supplied from the critical bus by facility planners or the
customer.
Setup of the Powerware Hot Sync CAN Bridge Card must be performed by an
authorized Eaton Customer Service Engineer. Contact an Eaton service representative
to schedule a date.
Figure 58
Power Xpert
®
9395P-1200 Installation and Operation Manual 164000500—Rev 11
Figure 61
for SCM II knockout hole location.
Figure 49
and
Figure
Terminal TB3
120 Vac Power
for terminal assignments.
Table 29
for the Powerware Hot Sync CAN
57,
Figure
55, and
Table 33
Figure
57,
Figure
55, and
Figure 57
for the SCM II
Table 33
for
for