Ground
Terminal
Terminal TB2 Customer
Supervisory Contact Interface
Terminal TB1 Signal
Connections from the UPS

Figure 5-10. Supervisory Contact Module II Terminal Location

NOTE
Setup of the Hot Sync CAN Bridge Card must be performed by an authorized Eaton
Customer Service Engineer. Contact an Eaton service representative to schedule a
date.
9.
Install wiring between the SCM II terminal block TB2 and the monitoring equipment. See Figure 5-10 for
terminal block location and Figure 5-11 for terminal assignments.
10. Close the front door and secure the latch.
11. Restart the UPS. See Chapter 7, "UPS Operating Instructions" for startup instructions.
®
®
Eaton
Power Xpert
9395P-300 (300kVA, 300kW) UPS Installation and Operation Manual
Terminal TB3
120 Vac Power
P-164000563—Rev 04 www.eaton.com/powerquality
Installing Options and Accessories
5-13

Advertisement

Table of Contents
loading

Table of Contents