7.
NOTE 120 Vac for the SCM II should be supplied from the critical bus by facility planners or the customer.
8.
Ground
Terminal
Terminal TB2 Customer
Supervisory Contact Interface
Terminal TB1 Signal
Connections from the UPS
NOTE Setup of the Powerware Hot Sync CAN Bridge Card must be performed by an authorized Eaton
Customer Service Engineer. Contact an Eaton service representative to schedule a date.
9.
10. Close the front door and secure the latch.
11. If removed, reinstall the safety shield panel removed in paragraph 5.1, Step 5.
12. If removed, reinstall the left front panel removed in paragraph 5.1, Step 4 and
13. Restart the UPS. See Chapter 7, "UPS Operating Instructions," for startup
t
Power Xpert
9395 UPS (450–550 kVA) Installation and Operation Manual
Install wiring between the UPS and SCM II. See Figure 5‐2 and Table 5‐1 for the
Powerware Hot Sync CAN Bridge Card terminal location and wiring information,
and Figure 5‐10, Figure 5‐8, and Table 5‐5 for the SCM II terminal location and
wiring information.
Install 120 Vac power wiring from the critical bus to the SCM II. See Figure 5‐10,
Figure 5‐8, and Table 5‐5 for the terminal location and wiring information.
Figure 5‐10. Supervisory Contact Module II Terminal Location
Install wiring between the SCM II terminal block TB2 and the monitoring
equipment. See Figure 5‐10 for terminal block location and Figure 5‐11 for
terminal assignments.
Secure with the retained hardware.
secure with the retained hardware.
instructions.
INSTALLING OPTIONS AND ACCESSORIES
Terminal TB3
120 Vac Power
S
www.eaton.com/powerquality
164201701 Rev 4
5-13