Maintenance Schedule - Stratasys Fortus 360mc User Manual

3d production system
Hide thumbs Also See for Fortus 360mc:
Table of Contents

Advertisement

MAINTENANCE SCHEDULE

Maintenance tasks must be performed on a regular basis in order to maintain optimal system operation.
1
outlines the general maintenance schedule. Detailed instructions for each task make up the rest of this
chapter.
Warning:
access panels.
Warning: Due to the UPS, High voltage is present in the system when the power
cord is unplugged.
Warning: Always wear proper heat protective clothing when working inside the
oven.
Table 7-1:
Maintenance Schedule
Daily Weekly Quarterly
X
X
X
X
Always power down and unplug the system before
"Clean the Platen" on page 80
"Empty the Purge Waste Bucket" on page 80
"Vacuum the Build Envelope" on page 81
"Clean/Inspect Tip Wipe Assembly" on page 81
"Inspect the Platen O-Ring" on page 83
X
"Clean the Vacuum System In-Line Filter and
X
Jar" on page 83
"Clean the Tip Sensor Plunger" on page 84
X
Maintenance Task
79
removing any of the
Table 7-

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fortus 400mc

Table of Contents