7.
Select the material to be loaded and press ENTER. (The <E> indicates the canisters that you can
select.)
Note: Model and support materials must be compatible. If a selected material is
incompatible with a loaded material, a material mis-match load error will occur.
The selected material will not be loaded.
A.
The head warms up to the material operating temperature (automatic - based on SmartSpool
data). This step also sets the oven temperature to the correct value for the material being
loaded (see
B.
The canister drive motor starts to push the filament to the liquefier tips.
Note: For some materials (i.e., SR20) the order of steps A and B are reversed.
C.
When the filament reaches the head (takes 2 to 4 minutes), it enters the liquefier tip, and the
tip purges a small amount of material.
8.
A successful load is indicated by a steady green LED. A complete load and purge cycle should
take less than five minutes.
CANISTER AUTO CHANGEOVER
Note: Auto changeover is included as part of the 4-bay system option. It is not
available with standard 2-bay system.
Auto changeover allows you to leave a long build unattended. When an active canister becomes empty:
1.
The system is paused and the canister drive automatically withdraws residual material from the
system.
2.
The changeover canister is pre-loaded, and then material is loaded to the head. The build job is
automatically resumed.
Note: If the material to be loaded is not the same as the material it is replacing, a
material mis-match load error will occur. The auto changeover will not occur and
the system will enter Pause mode.
3.
While the changeover is taking place, the user panel displays:
•
No user interaction is required.
•
Auto Changeover takes about five minutes.
>M1L:PPSF
92.0 in3 <E> (Ready)
M2L:PC
91.6 in3
S1L:PC_S
92.3 in3
S2L:PPSF_S 41.4 in3 <E> (Ready)
Table 4-2 on page 51
* Auto Changing Material*
* On Model Head
Please Wait .........
(Loaded)
(Loaded)
for oven stabilization information).
*
45