7.
Push canister all the way into the canister bay.
Figure 4-3:
Canister Installation
1
Table 4-1:
Key to
Item
Description
1
Foil Tape
2
Anti-Rotation Plug
3
Thumbwheel Door
4
Canister Snout
5
Filament
8.
Drop the filament drive block down onto the canister by pulling out the canister drive lever.
(Figure
4-4)
•
Verify that the filament drive is aligned with the filament exit.
•
The LED is OFF at this point.
After about five seconds, the SmartSpool chip is read by the system and the drive block motor
•
starts turning.
The canister is now installed into its canister bay, and filament is ready to be pre-loaded to the drive wheels.See
for details.
3
2
Figure 4-3
Item
6A
Plastic Plug (operating position)
6B
Plastic Plug (storage position)
7A
Foam Gasket (operating position)
7B
Foam Gasket (storage position)
5
4
Description
42
6A
7A
6B
7B